{"id":23297,"date":"2026-02-12T10:35:20","date_gmt":"2026-02-12T16:35:20","guid":{"rendered":"https:\/\/elmetidosv.com\/?p=23297"},"modified":"2026-02-12T10:35:20","modified_gmt":"2026-02-12T16:35:20","slug":"inician-excavaciones-para-proyecto-de-metrocable-en-san-salvador","status":"publish","type":"post","link":"https:\/\/elmetidosv.com\/?p=23297","title":{"rendered":"INICIAN EXCAVACIONES PARA PROYECTO DE METROCABLE EN SAN SALVADOR"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"992\" height=\"1024\" src=\"https:\/\/elmetidosv.com\/wp-content\/uploads\/2026\/02\/metro-2-1-992x1024.jpeg\" alt=\"\" class=\"wp-image-23299\" srcset=\"https:\/\/elmetidosv.com\/wp-content\/uploads\/2026\/02\/metro-2-1-992x1024.jpeg 992w, https:\/\/elmetidosv.com\/wp-content\/uploads\/2026\/02\/metro-2-1-291x300.jpeg 291w, https:\/\/elmetidosv.com\/wp-content\/uploads\/2026\/02\/metro-2-1-768x793.jpeg 768w, https:\/\/elmetidosv.com\/wp-content\/uploads\/2026\/02\/metro-2-1.jpeg 1290w\" sizes=\"auto, (max-width: 992px) 100vw, 992px\" \/><\/figure>\n\n\n\n<p><em>San Salvador<\/em> \u2014 Las obras del proyecto Metrocable avanzan con el inicio de las excavaciones en el sector del Parque Cuscatl\u00e1n, como parte de la fase inicial para la instalaci\u00f3n de la infraestructura del nuevo sistema de transporte a\u00e9reo, inform\u00f3 el Ministerio de Obras P\u00fablicas (MOP).<\/p>\n\n\n\n<p>El titular de la cartera de Estado, Romeo Rodr\u00edguez, detall\u00f3 que el proyecto contempla la construcci\u00f3n de 22 torres, cada una con 10 pilotes, que sostendr\u00e1n el sistema a lo largo de su recorrido. El trazado iniciar\u00e1 en la calle Zacamil y la 5.\u00aa avenida Norte, y finalizar\u00e1 en la calle Rub\u00e9n Dar\u00edo, conectando con el centro hist\u00f3rico de San Salvador.<\/p>\n\n\n\n<p>Seg\u00fan las autoridades, el Metrocable tendr\u00e1 una extensi\u00f3n aproximada de 3.5 kil\u00f3metros y contar\u00e1 con cuatro estaciones: Zacamil, sector de la Universidad de El Salvador, Centro de Gobierno \u2014con conexi\u00f3n peatonal y enlace a rutas de autobuses\u2014 y la estaci\u00f3n final en la calle Rub\u00e9n Dar\u00edo.<\/p>\n\n\n\n<p>El ministro Rodr\u00edguez explic\u00f3 que el sistema est\u00e1 dise\u00f1ado para movilizar hasta 7,000 pasajeros por hora y operar durante 18 horas diarias, iniciando a las 3:00 de la madrugada. De acuerdo con las proyecciones oficiales, el tiempo de traslado en todo el recorrido ser\u00e1 menor a 15 minutos, lo que permitir\u00e1 reducir significativamente los tiempos actuales, que pueden superar la hora en transporte p\u00fablico convencional.<\/p>\n\n\n\n<p>El proyecto contar\u00e1 con 153 g\u00f3ndolas, cada una con capacidad para 10 personas sentadas, y beneficiar\u00e1 de forma directa a unas 200 mil personas, principalmente residentes de zonas con alta demanda de movilidad hacia el centro de la capital.<\/p>\n\n\n\n<p>La inversi\u00f3n estimada ronda los 110 millones de d\u00f3lares y el plazo de construcci\u00f3n es de 18 meses a partir del inicio formal de las obras. El MOP indic\u00f3 que durante el presente a\u00f1o ya se han ejecutado trabajos preliminares en distintos puntos del sector del Parque Cuscatl\u00e1n, como parte del proceso de preparaci\u00f3n del terreno.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-twitter wp-block-embed-twitter\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\"><p lang=\"es\" dir=\"ltr\"><a href=\"https:\/\/twitter.com\/hashtag\/Nacionales?src=hash&amp;ref_src=twsrc%5Etfw\">#Nacionales<\/a><br>El ministro de <a href=\"https:\/\/twitter.com\/ObrasPublicasSV?ref_src=twsrc%5Etfw\">@ObrasPublicasSV<\/a>, Romeo Rodr\u00edguez, confirm\u00f3 el inicio de las obras para la construcci\u00f3n del metrocable en San Salvador. <br>El proyecto es parte de un plan integral de movilidad y transporte que busca mejorar la conectividad y traslado de miles de usuarios <a href=\"https:\/\/t.co\/JkxNHDzKwS\">pic.twitter.com\/JkxNHDzKwS<\/a><\/p>&mdash; El Metido (@elmetidooficial) <a href=\"https:\/\/twitter.com\/elmetidooficial\/status\/2021985946489827523?ref_src=twsrc%5Etfw\">February 12, 2026<\/a><\/blockquote><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>San Salvador \u2014 Las obras del proyecto Metrocable avanzan con el inicio de las excavaciones en el sector del Parque<\/p>\n","protected":false},"author":2,"featured_media":23298,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[1],"tags":[2485,2996,2120,2423,2993,2986,2988,2995,2994,2990,2992,2420,2985,126,2991,1393,2989,2987],"class_list":["post-23297","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacional","tag-centro-historico","tag-desarrollo-urbano","tag-infraestructura","tag-infraestructura-vial","tag-metrocable","tag-metrocable-san-salvador","tag-ministerio-de-obras-publicas","tag-mop","tag-movilidad","tag-movilidad-urbana","tag-obras-metrocable","tag-obras-publicas","tag-parque-cuscatlan","tag-san-salvador","tag-sistema-de-transporte-tags-el-salvador","tag-transporte","tag-transporte-publico-el-salvador","tag-zacamil"],"_links":{"self":[{"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/posts\/23297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23297"}],"version-history":[{"count":1,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/posts\/23297\/revisions"}],"predecessor-version":[{"id":23300,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/posts\/23297\/revisions\/23300"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=\/wp\/v2\/media\/23298"}],"wp:attachment":[{"href":"https:\/\/elmetidosv.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elmetidosv.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}